The raw mill has an installed drive power of 3000 kW and is designed to grind 280 tph of cement raw material to a product fineness of less than or equal to 12% 90 µm.

The order was placed through the Chinese General Contractor Beijing Kaysun Trading, a subsidiary of CATIC headquartered in Beijing.

Gebr. Pfeiffer’s staff will supervise erection and commissioning.

Delivery of the equipment is planned to begin in 2H17.